Once the vegetation is gone, the ground still has to be made usable. Grading and site prep is the earthwork that turns cleared land into something you can build on, drive on, or drain properly.
What this covers
- Cut and fill to a finished elevation
- Building pads, compacted and to grade
- Positive drainage away from structures
- Swales and drainage contours
- Driveway base and culvert setting
- Erosion control — silt fence, inlet protection, temporary seeding
Elevation matters more here than most places
Much of southern Beaufort County sits low. Finished floor elevation, base flood elevation and how water leaves the site are not afterthoughts — they determine whether the house gets a certificate of occupancy and what the owner pays for flood insurance for the next thirty years.
If you have a survey or an engineered site plan, we work to it. If you do not, we will tell you when you need one before we move dirt.
Stormwater and the one-acre threshold
Disturbing an acre or more generally puts the project under state stormwater permitting, which means an approved plan and maintained erosion controls for the duration. Below an acre, local requirements may still apply. More on that here →
Working with wet ground
Lowcountry soil holds water. Compaction numbers that are easy in February can be impossible in July. We will tell you honestly when waiting three weeks will produce a better pad than pushing through.